424 W Rivo Alto Dr, Miami Beach, Florida 33139





MLS#: A11719951
$38,000,000 USD
- Single Family Home
- 6
- 8
638 m² (6,867 ft²)
Listed By LoKation
The Single Family Home for Sale located at Miami Beach, Florida 33139 is currently for sale. Miami Beach, Florida 33139 is listed for $38,000,000. This property has 6 bedrooms, 8 bathrooms, Private Dock, Waterfront, Subdivision, In-ground Pool, Association Pool features. If the property located at Miami Beach, Florida 33139 isn't what you're looking for, visit https://www.sfpropertysearch.com to see other Single Family Homes for Sale in Miami Beach .
Date Updated : Jun 10, 2025
Property features
Key features
- Private Dock
- Waterfront
- Subdivision
- In-ground Pool
- Association Pool
- Ocean View
- Intra Coastal View
- Bay View
- Ocean Front
Construction details
- Year built: 2025
- Building condition: New Construction
- Roofing: Concrete
Other features
- Property features: Garage
- Appliances: Washer Refrigerator Dryer Dishwasher
- Cooling system: Central AC
- Heating system: Central
- Garages: 6
Area
- Property size:
638 m² (6,867 ft²) - Land/Lot size:
1,243 m² (13,382 ft²) - Bedrooms: 6
- Bathrooms: 8
- Total rooms: 14
School information
- Elementary School: South Pointe
- High School: Miami Beach
Description
This brand-new, elevated, luxury home offers over 9,000 sqft of contemporary living with open water bay views and Miami skyline sunsets. Boasting 6 spacious bedrooms, 6 plus 2 half bathrooms, the residence features exquisite interior finishes. Custom kitchen by Ernestomeda with high-end appliances by Wolf, Miele, and Sub-Zero. Custom bathrooms by Casabath. White oak ceilings in the primary bedroom and dreamy walk-in closet, floor-to-ceiling glass & stone walls in the primary bath. The open floor plan seamlessly transitions to an outdoor oasis, complete with kitchen, dining area, pool & dock on 104 ft of water frontage. The rooftop offers stunning 360 degree views while the understory features a 3-car garage, additional covered parking and elevator access. Expected completion August 2025.